Merlo Roto and a second telehandler beside columns going up at Smith Campus, with steel beams staged in the foreground.

Structural steel erection and miscellaneous metal installation.

CWB Certified to W47.1 DIV 3 for on site welding services.

  • Over 42,000 tons erected since 2008
Scroll

A leading steel erector in BC

  • Since 2008
  • CWB certified CSA W47.1 Div 3
  • Langley, BC
  • Over 42,000 tons erected since 2008

What we do

Structural Steel, raised right.

  • Schools
  • Aquatic centres
  • Community centres
  • Hospitals
  • Correctional institutions
  • Arenas
  • Hotels
  • High-rise towers
  • Industrial steel
  • Silos
  • Marine and fisheries infrastructure
  • Defence sector field services
  • Enclosures
  • Commercial steel

We also provide the installation of miscellaneous metals packages, including guardrails, handrails, all types of stairs, canopies, trellises, ornamental steel, architectural features, and metal art sculpture installations.

01

Structural steel erection

Offloaded, sorted, erected, bolted, torqued, plumb, square and true.

Read the scope

02

Welding

Field welds by CWB certified welders, procedures, supervisors and inspectors, Quality Control you can rely on

Read the scope

03

Joists

OWSJ, Girders, Trusses. We carefully plan and execute the erection of simple joists to arena sized Trusses.

Read the scope

04

Stairs

From basic mezzanine access to spiral feature stairs in a civic lobby

Read the scope

05

Miscellaneous metals

The steel that is not the frame, and still has to be right.

Read the scope

Steel roof framing going up among timber columns at Winskill Aquatic and Fitness Centre in Delta.

For fabricators

We integrate seamlessly with your team, coordinating design and details, phasing plans and erection methodology. Our field crews deliver on schedule and budget. Quality is assured and safety guides every step of the way.

Equipment

Premium equipment fleet

Merlo Roto in front of erected roof steel at Smith Campus.

Merlo Roto 50.35 S-Plus

Red Iron is the first steel erector in BC to deploy the Merlo Roto 50.35 S-Plus.

In use since 2025.

Lifting and material handling

  • Merlo 50.17 telehandler (purchased Nov 2026).
    Red Iron's Merlo 50.17 telehandler on site
  • JLG 1055 telehandler.

Aerial work platforms

  • Genie Z62 boom lift.
  • JLG scissor lifts.
  • Snorkel SJ66T boom lifts, outfitted with inverter welders in the basket.

Welding

  • Lincoln Ranger EFI mobile welders.
  • inverter welders.

Support and site

  • a fleet of company trucks.
  • job site offices.
  • A vast array of erection and welding equipment.
Lincoln Ranger 330MPX engine welder in use on site
Lincoln Ranger 330MPX engine welder with Red Iron decal
Lincoln Power MIG 210 MP inverter welder mounted in a boom-lift basket
Lincoln Ranger engine welder being hoisted on site
Lincoln Ranger EFI engine welder in a truck bed
Lincoln Ranger EFI engine welder on a slab

“Red Iron has been an absolute pleasure to work with throughout the job. … I would gladly recommend them for future structural steel work and would welcome the opportunity to work with their team again.”

Daniel Moon, Superintendent, Canadian Turner Construction Company Smith Campus, Langley

Careers

Ironworkers, welders and crane operators.

Red Iron offers exciting careers for ironworkers, welders and crane operators. We pay competitive wages, with benefits, RRSP matching and life insurance.

See careers

Contact

1125 252 Street, Langley, BC V4W 2S8

604-996-2383

aaron@redironinstall.com